Thursday, March 20, 2014

Day 4

Framing and turf cutting operations continued throughout the morning. One of the fun challenges of this project is that you must do all the construction within your given plot. This has required us to move, re-move, and move again our lumber supply to make way for new tasks. Luckily, because the turf rolls are too large, we have been given permission to work outside our plot on the adjacent lawn area.At 11:00am GiGi arrived with three loads a load of sand/gravel scree. We had to quickly clean up our job site, move the lumber out of the way, and make room for the delivery. He brought us three loads, which we spent several hours pushing around the plot to make it flat. Today was also the warmest day since we've been here. Sand and sun made for an exhausting workout. 

In the afternoon we setup the small berm. I am still undecided where it should align. Our plot is a bit larger on the left side than I had anticipated. This may allow for the small berm to move back 1m and increase the center area. It is difficult to decide without seeing the gazing globe. Ah yes, the gazing globe. It was supposed to be delivery prior to our arrival on Monday, but I had to delay the shipment from China because I was told I needed to be here in person to pay duty charges. Fine, delivery was supposed to arrive on Wednesday. The day came and went, then it was supposed to arrive today. No sign of it. Tomorrow we will keep our fingers crossed for its arrival, but based on the way things seem to go, we will likely see it Monday. 

Progress update: large berm is all framed out, including the bench, and the small berm is up and standing. 

(load one)

(grading begins)


(watering the scree for compaction and to minimize dust)

(small berm framing)

(the bench gets mocked up)

(testing out the turf pattern)

(The two minute nap)









Tuesday, March 18, 2014

Day 2

Another whirlwind day, despite the damp chilly air. We started by assembling the second ramp of the large berm. We then framed in the middle portion, which will eventually become the bench. In order to test our method for the turf application we made a little mockup. Measure twice, cut once...with any luck.

While Rod, Tom and I  were busy framing, Natalie and Katie made forward progress on cutting the turf squares. They had to cut off 6m of squares in order to make the roll light enough for all of us to lift and turn it around. By doing so we were able to unroll the remaining portion, which was long enough for us to cut the seamless ramp pieces.

We also cut all the pieces of OSB for the top of the ramps, and were we able to lay down the turf. Things are really starting to take shape now. 

No sun today, by the end we were all frozen and very much looking forward to dinner.

Progress update: large berm ramps nearly completed.































Monday, March 17, 2014

Day 1

After our train ride from Paris we arrived on site at 8:30 am. The air was thick with fog. As we entered the festival site it felt as though we were stepping into an enchanted forest. We were kindly greeted by the head gardener, Gerard, and the woman who manages the on site accommodation, Isabelle. Hard to believe that our crew will spend the next 12 days living here at the Domaine Chaumont-sur-Loire! 

As per our specifications, our plot had been graded and compacted with a limestone sub-base before our arrival. The lumber we ordered last week was sitting and waiting for us too. First task, set out the baselines. The design is structured on a 1m x 1m grid. Once we determined the center point for the design (which took several attempts) we were able to run perpendicular string lines to delineate the gird. We used the 3-4-5 triangle method to make sure we were square.

After our 3-course lunch (they serve us three robust meals a day in the dining hall!) we headed back out to check on the construction of the trusses. Prior to our arrival  we coordinated with the local/on site carpenter crew to help us build our truss system for the ramps--they delivered them to our plot late this afternoon.

While the trusses were finishing up we decided to delve into cutting turf squares. First we had to locate our turf rolls, which were being stored alongside a greenhouse in the back work yard. With a handy carpet cutter we were able to quickly begin cutting a few pieces. The head groundsman, Gigi, used a fork lift to deliver the 5m long rolls to our plot area.

Day 1 was extremely productive--luckily we shipped our tool set over last week, I'm not sure what we would have done without all our wonderful supplies right at hand.

Progress Update: trusses for ramp one are up and standing.


(Good morning Domaine Chaumont-sur-Loire)

(Plot 22)

(Unpacking and setting up)


(The gear)

(Setting the baseline grid)



(Trusses for ramp one)

(Hooray for local carpenters)

(Where our turf was being stored)

(Turf roll)

(Cutting turf)

(Turf on the move)





(Our accommodation, goodnight!)